● Sample data ·
Good evening.
Two factories, every site and every centre — on one screen, updated as it happens.
All systems live
Factory output · square feet per day Capacity line = 4.4M sq ft a year
Live · what the system did auto-refreshing
Needs your yes today 3 waiting
Two plants · load right now
The network · factory to every centre
Connections where the data will come from
Eva
HIFAB's window software today: window quotes, production, machine cut commands and stock.
To connect · after we see Eva and HifabERPHifabERP
HIFAB's own system, built in-house over five years. We see what it holds before we plan anything.
To connect · after we see Eva and HifabERPWhatsApp
Site photos and daily reports in, alerts and reminders out.
To connect · after we see Eva and HifabERPTally
The books: bills raised, payments received, what is owed.
To connect · after we see Eva and HifabERPNothing here is connected yet. We read from Eva and HifabERP and add what they lack. We do not replace them, and we do not do costing or machine integration. The "from Eva", "from HifabERP" and "new from Recurlab" tags on each screen show where its data will come from.
● Sample tower · illustrative
Panel Twin
Every unitised panel has a QR tag. Its whole life — cut, coated, glazed, checked, lifted — sits on the building itself.
East elevation
Panel passport
Tap any panel on the building.
You will see where it is, who touched it, which machine cut it, its six quality checks, the silicone cure time, the truck and the crane lift.
Red outline = held by the system for a reason.
You will see where it is, who touched it, which machine cut it, its six quality checks, the silicone cure time, the truck and the crane lift.
Red outline = held by the system for a reason.
Floors at risk of missing the crane slot
Panels by stage
● Sample tower, sample numbers · the steps are from HIFAB's own process videonew from Recurlabfrom Eva
Panel Passport
Each unitised panel gets one ID and a QR label. The passport follows it from the factory to installed on the building.
Pick a panel
TA-12-07 = Tower A, floor 12, panel 7. Or click a square: top row is the top floor.
Demo clock: +0 hFor the demo only: moves time forward so the 24 h cure can finish.
Passport kept in memory in this demo; nothing is saved
Dispatch plan · racks in the site's install order new from Recurlab
Bracket readiness · from the site new from Recurlab
Brackets fixed on the slab edge, two anchors per bracket. The Site engineer confirms each floor. Click a floor to flip it.
A tick means the floor can take panels. A dispatched panel on a floor without a tick would wait on site.
Scan to install · site engineer's phone new from Recurlab
Sample: no camera is used. The button stands for scanning the QR label on the panel.
Silicone use check · expected against issued new from Recurlab
Expected silicone comes from the metres of glass edge in the panels that went through the clean room that day. Issued figures are sample issue slips.
Glass edge per panel
Sample: the panel perimeter, 2 × (2.4 + 3.6) m, as drawn in the Panel Twin.
Silicone per metre (ml) · to set with HIFAB
Sample bead of 6 × 10 mm = 60 ml a metre.
Flag waste above (%) · to set with HIFAB
● Sample data · machine names from hifab.in; plant, load and status are sample
Factory Floor
Sachana (Factory 1) and Jakhwada (Factory 2). 500,000 sq ft of production area, one live view.
Line flow · panels waiting at each step red = today's bottleneck, found automatically
Powder coating queue grouped by colour
Silicone room · curing now
Six quality checkpoints · today names illustrative
● Sample projects · illustrative
Projects & Sites
Every live facade job: what is made, what is up, what is billed, and what is about to slip.
Already delivered · from hifab.in
● Sample visitors and rates · illustrative
Experience Centres
From the moment someone walks in to the day their window is fixed — nobody is forgotten, nothing is re-typed.
In the centres right now latest 6
Walk-in to installed · last 30 days
Room brief → instant quote the specialist fills this with the customer
What we read before we draw
Collection
Width ·
Height ·
Glass
Finish
Live preview
Indicative price
Made & fitted in
● Sample tasks · illustrative
Family Desk
Three leaders, one desk. Tasks raise themselves from factory, site and centre — and every morning arrives on WhatsApp at 8.
● Sample rules · each is a switch
Autopilot
The rules your best manager follows — written down once, run every minute, never on leave.
0 actions today
Rules
Firing now
Delay escalation ladder new from Recurlabrule said at the 25 Nov meeting
When something is late, it does not wait for someone to notice. It moves up by itself: first the GM, then Nimit, then Ashit.
Try a delay
Late right now · sample
● Answers from this demo's sample data
Ask HIFAB
Type a question the way you would ask your manager.
● Sample activity · each agent is a set of rules + AI, with a person approving
Your AI team
Eight digital colleagues that never sleep. They read, count, draft and chase — your people decide.
0 tasks done today
How a quote moves now from drawing to signed order, the agents in the middle
● Sample schedule · any file you drop runs this sample in the demo
Quote (Eva)
Drop the architect's window schedule. The Estimator counts every opening, matches it to your systems, builds the bill of materials and a draft quote. Your estimator checks it.
1 · The drawing
Drop a PDF window schedule or facade drawing
or
2 · What the Estimator found
Waiting for a drawing.
● Computed live in your browser from the sample schedule · not a promise for your plant until run on your cut lists
Cut list (Eva)
Every outer-frame piece in the job, packed onto stock bars the smart way, and long offcuts flagged for the next job. Compared with cutting each piece from the bar in hand, type by type, with no going back.
Bar in hand, type by type, no going back first 16 bars
Cut by the optimiser first 16 bars
Scope: outer-frame pieces only (sash and mullion pieces are not in this sample). Method: pieces sorted longest first and placed on the first bar with room (first-fit decreasing), 4 mm saw cut, offcuts of 600 mm or more kept for reuse. Established fabrication software includes cut optimisation, for example Orgadata LogiKal.
● Sample conversation · The Window Factory on WhatsApp
WhatsApp Concierge
A customer sends a photo of their room at 11 pm. They get their window drawn into it, a price range and a site-measure slot — before anyone at TWF wakes up.
What the concierge did, by itself
After the window is fixed
Reported elsewhere: Meta has announced Business AI on WhatsApp for Indian businesses (May 2026), answering in Indian languages and booking appointments; HomeLane reported WhatsApp leads converting at 2.8% vs 1.3% from email/SMS (AiSensy case study, vendor-reported); VELUX, Pella and IKEA Kreativ offer room-visualiser tools.
● Fictional projects · once connected, the Scout reads public RERA registrations + your own CRM
Project Radar
New towers are registered months before the facade is tendered. The Scout finds them, sizes the facade, names the architect and drafts the first note.
New this month, best fit first
Draft from the Scout
Pick a project to see the facade estimate and the first note to its architect.
Architect network architects specify; the Scout keeps every relationship warm
Reported elsewhere: Biltrax (India) and Barbour ABI / BCI Central (abroad) say they sell new-project tracking to building-product makers. Gujarat RERA publishes project registrations; how we may use that data in bulk is still to be checked.
● Sample photo drawn from the Tower A Panel Twin
Site Eye
The site engineer sends one photo on WhatsApp. Site Eye counts the panels that are up, checks them against the Panel Twin and raises the bill for finished floors.
Tower A · east face · received 17:42 from site
What Site Eye read
Press "Scan today's photo".
Reported elsewhere: a 2025 study using tower-crane cameras and an AI image model reported 95.9% precision in recognising installed curtain-wall panels on a super-high-rise (EasyChair preprint 7xJG); DroneDeploy sells AI progress tracking from drone and 360° photos.
● Aluminium tonnage is sample · carbon factors are published figures, sources named below
Carbon Passport
Developers and green-building raters ask what a facade costs the planet. Answer it per project, in one click, and show what a low-carbon aluminium choice saves.
Aluminium in this facade
Where the metal comes from
Embodied carbon of the aluminium
Factors: Indian primary aluminium on coal power ≈ 17–20 t CO₂e per tonne (ICRA research note); Hydro states REDUXA is ≤ 4.0 kg CO₂e/kg, verified by DNV (per hydro.com); Hydro CIRCAL ≥ 75% post-consumer scrap, EPD average 1.9 kg CO₂e/kg (Hydro, 2024). Covers the aluminium only — not glass, sealants, transport or fabrication.
● Sample jobs · the three towers, residential and hospital jobs are the same ones as on Projects & Sites; the rest are fictional
Order Cycle
Every job from the first inquiry to the last rupee collected. One line, one owner per step, and the stuck ones in red.
Inquiry to cash · facades 13 sample jobs · click any job to see its whole journey
The journey
Pick a job above.
Inquiries and quotes · last 90 days sample
● Sample drawing register · illustrative
Drawings & Approvals
Shop drawings, samples, questions to the architect and paid changes. Nothing goes to the factory floor until its drawing is approved.
Shop drawing register
Questions to the architect (RFIs)
Changes the client asked for extra work = extra bill
● Sample stock, suppliers and lead times · illustrative
Purchase & Stores
What the production plan needs in the next 30 days, what is in the store, what is on the way, and what will run short.
Stock · on hand, reserved for projects, at the coater from Eva
Stock counts come from Eva and HifabERP once connected. This screen adds what is reserved for each project and what is out at the coater, so the free quantity is honest. Red = reserved for projects is more than is on hand.
Material requisitions from HifabERPFMR = factory, SMR = site
Press the button on a line to move it forward: raised → issued → received. Project readiness on the right follows.
Project readiness new from Recurlab
A project is Ready only when every requisition line is received. Otherwise it names what is missing, so "done in production" can no longer hide a missing item.
Material cover against the plan days of cover · red = runs out before the next delivery
Open purchase orders
Suppliers · on time, last 90 days sample
Glass short receipt · from the store person's phone new from Recurlabnothing is sent from this demo
Purchase order
Ordered
Received
Photo of the delivery
+ Add photo (placeholder)
● Sample trucks, crews and snags · illustrative
Dispatch & Install
What leaves the factory today, what each site received, which crew is fixing what, and what is left before handover.
Trucks today a truck cannot leave without passed QC, the challan and the e-way bill
Install crews today
Snag list · open 5 of 9 shown
Handover pack · Tower C
● Sample contract values and payments · your books stay in your accounting software; this screen reads from it and from site progress
Money
What is signed, what is installed, what is billed, what is collected, and what is held back. Job by job, and the next 13 weeks of cash.
Job by job · ₹ crore installed-but-not-billed in red
Who owes us, by age
Cash · next 13 weeks money in vs money out · sample
Tax, guarantees and contract terms sample
Margin per job · quoted vs running aluminium, glass, labour, site · sample
● Sample tickets · illustrative
Service & Warranty
After the window is fixed: complaints, warranty, defects-period work on facades and yearly service. Every ticket has a clock.
Open tickets
Before the monsoon yearly seal and hardware check
● Sample figures · illustrative
Good evening, Ashit.
One calm page. Six numbers and three plain lines. Everything else is one click away.
In plain words
● Sample bill, cut list and rate · all made up. The 30% rule is an assumption to confirm with HIFAB
Powder-coating bill check
The coater's bill, checked line by line against what we actually cut. Coated faces count in full, non-coated faces count at an agreed percentage, and changed lengths count at the new length.
Our assumptions change the percentage and everything below recalculates
agreed rule, to confirm with HIFAB
Rate on this bill: / sq ft (sample rate)
Differences under 0.5 sq ft a line are ignored.
The coater's bill Coater X · batch RAL 7016 (sample)
Our calculation from the cut list
Lines that do not match
Area = length × pieces × (coated faces + non-coated faces × the percentage above) ÷ 92,903 (sq mm per sq ft). Over-billed = the coater's area minus ours, times the rate. Approve accepts the coater's figure; Query coater holds the line and drafts a note to the coater. Nothing is sent from this demo.
● Sample sites and reports · illustrative
Daily site report
Each site engineer fills this once a day: what was done, how many people, any issue, one photo. It replaces the WhatsApp report.
Today's report
Site
Work done today
People on site
Photo
+ Add photo (placeholder)
Issues
Today's sites
Rule: reminder at 6:15 pm, then if there is still no report at 7 pm the project manager gets an alarm. Change the time above to see it.
● Sample project drawn from the Tower A Panel Twin · dates are sample
The developer's view
What a builder or developer sees when they sign in: their own project only. Progress, dates, snags and documents. No prices and no internal costs.
Progress by floor panels installed
Progress by elevation
Next dates
Open snags
Documents
Check a panel installed or not, nothing else
TA-12-07 = Tower A, floor 12, panel 7. This view shows only whether a panel is installed. Batches, racks, trucks and QA records stay inside HIFAB.
● Demo logins, no passwords · who sees what is a proposal to confirm with HIFAB
Roles & logins
Each person signs in and sees only the screens they need. Pick a role here or in the top bar and the menu on the left changes.
Who sees which screen ● = can open it
Panel Passport: Nimit, Store and Site engineer open it. The Developer sees only installed or not on the Developer's view, never batches or QA records.